{"id":11199,"date":"2026-07-24T11:30:21","date_gmt":"2026-07-24T09:30:21","guid":{"rendered":"https:\/\/eastregion.mk\/2026\/07\/24\/signing-of-the-contract-and-commissioning-introduction-of-ee-measures-and-improvement-of-spatial-conditions-in-the-educational-process-through-the-extension-and-reconstruction-of-the-primary-school-2\/"},"modified":"2026-07-28T11:14:12","modified_gmt":"2026-07-28T09:14:12","slug":"signing-of-the-contract-and-commissioning-introduction-of-ee-measures-and-improvement-of-spatial-conditions-in-the-educational-process-through-the-extension-and-reconstruction-of-the-primary-school-2","status":"publish","type":"post","link":"https:\/\/eastregion.mk\/en\/2026\/07\/24\/signing-of-the-contract-and-commissioning-introduction-of-ee-measures-and-improvement-of-spatial-conditions-in-the-educational-process-through-the-extension-and-reconstruction-of-the-primary-school-2\/","title":{"rendered":"Signing of the contract and commissioning, &#8220;Introduction of EE measures and improvement of spatial conditions in the educational process through the extension and reconstruction of the Primary School: &#8220;Sinisa Stoilov&#8221; in the municipality of Zrnovci&#8221;"},"content":{"rendered":"<p>On July 21st (Tuesday), the Public Procurement Agreement was signed, &#8220;Extension and reconstruction of the &#8220;Sini\u0161a Stoilov&#8221; Primary School in the municipality of Zrnovci&#8221; as part of the project: &#8220;Introduction of EE measures and improvement of spatial conditions in the educational process through the extension and reconstruction of the &#8220;Sini\u0161a Stoilov&#8221; Primary School in the municipality of Zrnovci, with the Contractor Company for production, construction, transport, trade and services EURO &#8211; SHARRI DOOEL export-import village of Selce, Tetovo.<\/p>\n<p>The total value of the project is 4,682,560.96 denars including VAT.<\/p>\n<p>The project is financed by the Ministry of Local Self-Government, municipality of Zrnovci.<\/p>\n<p>At the same time, the Center for Development of the Eastern Planning Region put the project into operation and began construction activities for the project on July 24th (Friday) 2026.<\/p>\n<p>The contractor has until 20.11.2026 to complete the planned works.<\/p>\n<p>The implementation of this project proposal will make a significant contribution to improving the quality of primary education in the municipality of Zrnovci by increasing the spatial capacity of the Primary School &#8220;Sini\u0161a Stoilov&#8221;, Zrnovci municipality, introducing EE measures for the facility through the construction of a thermally insulated EE facade and roof.<\/p>\n<p>The reconstruction of the facility would build a ground floor with two floors of new premises for the needs of primary education, a total of 153m2 of new premises for education.<\/p>\n<p>This would directly benefit 132 students and 28 employees. And this would indirectly benefit 2086 residents of the municipality of Zrnovci.<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignnone size-medium wp-image-11190\" src=\"https:\/\/eastregion.mk\/wp-content\/uploads\/2026\/07\/1-2-300x225.jpg\" alt=\"\" width=\"300\" height=\"225\" srcset=\"https:\/\/eastregion.mk\/wp-content\/uploads\/2026\/07\/1-2-300x225.jpg 300w, https:\/\/eastregion.mk\/wp-content\/uploads\/2026\/07\/1-2-1024x768.jpg 1024w, https:\/\/eastregion.mk\/wp-content\/uploads\/2026\/07\/1-2-768x576.jpg 768w, https:\/\/eastregion.mk\/wp-content\/uploads\/2026\/07\/1-2-1536x1152.jpg 1536w, https:\/\/eastregion.mk\/wp-content\/uploads\/2026\/07\/1-2.jpg 2016w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/> <img decoding=\"async\" class=\"alignnone size-medium wp-image-11192\" src=\"https:\/\/eastregion.mk\/wp-content\/uploads\/2026\/07\/2-2-300x225.jpg\" alt=\"\" width=\"300\" height=\"225\" srcset=\"https:\/\/eastregion.mk\/wp-content\/uploads\/2026\/07\/2-2-300x225.jpg 300w, https:\/\/eastregion.mk\/wp-content\/uploads\/2026\/07\/2-2-1024x768.jpg 1024w, https:\/\/eastregion.mk\/wp-content\/uploads\/2026\/07\/2-2-768x576.jpg 768w, https:\/\/eastregion.mk\/wp-content\/uploads\/2026\/07\/2-2-1536x1152.jpg 1536w, https:\/\/eastregion.mk\/wp-content\/uploads\/2026\/07\/2-2.jpg 2016w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/> <img decoding=\"async\" class=\"alignnone size-medium wp-image-11194\" src=\"https:\/\/eastregion.mk\/wp-content\/uploads\/2026\/07\/3-2-300x225.jpg\" alt=\"\" width=\"300\" height=\"225\" srcset=\"https:\/\/eastregion.mk\/wp-content\/uploads\/2026\/07\/3-2-300x225.jpg 300w, https:\/\/eastregion.mk\/wp-content\/uploads\/2026\/07\/3-2-1024x768.jpg 1024w, https:\/\/eastregion.mk\/wp-content\/uploads\/2026\/07\/3-2-768x576.jpg 768w, https:\/\/eastregion.mk\/wp-content\/uploads\/2026\/07\/3-2-1536x1152.jpg 1536w, https:\/\/eastregion.mk\/wp-content\/uploads\/2026\/07\/3-2.jpg 2016w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/> <img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-11196\" src=\"https:\/\/eastregion.mk\/wp-content\/uploads\/2026\/07\/4-2-300x225.jpg\" alt=\"\" width=\"300\" height=\"225\" srcset=\"https:\/\/eastregion.mk\/wp-content\/uploads\/2026\/07\/4-2-300x225.jpg 300w, https:\/\/eastregion.mk\/wp-content\/uploads\/2026\/07\/4-2-1024x768.jpg 1024w, https:\/\/eastregion.mk\/wp-content\/uploads\/2026\/07\/4-2-768x576.jpg 768w, https:\/\/eastregion.mk\/wp-content\/uploads\/2026\/07\/4-2-1536x1152.jpg 1536w, https:\/\/eastregion.mk\/wp-content\/uploads\/2026\/07\/4-2.jpg 2016w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>On July 21st (Tuesday), the Public Procurement Agreement was signed, &#8220;Extension and reconstruction of the &#8220;Sini\u0161a Stoilov&#8221; Primary School in the municipality of Zrnovci&#8221; as part of the project: &#8220;Introduction of EE measures and improvement of spatial conditions in the educational process through the extension and reconstruction of the &#8220;Sini\u0161a Stoilov&#8221; Primary School in the [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":11188,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_exactmetrics_skip_tracking":false,"footnotes":""},"categories":[27],"tags":[],"class_list":["post-11199","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/eastregion.mk\/en\/wp-json\/wp\/v2\/posts\/11199","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/eastregion.mk\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/eastregion.mk\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/eastregion.mk\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/eastregion.mk\/en\/wp-json\/wp\/v2\/comments?post=11199"}],"version-history":[{"count":1,"href":"https:\/\/eastregion.mk\/en\/wp-json\/wp\/v2\/posts\/11199\/revisions"}],"predecessor-version":[{"id":11200,"href":"https:\/\/eastregion.mk\/en\/wp-json\/wp\/v2\/posts\/11199\/revisions\/11200"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/eastregion.mk\/en\/wp-json\/wp\/v2\/media\/11188"}],"wp:attachment":[{"href":"https:\/\/eastregion.mk\/en\/wp-json\/wp\/v2\/media?parent=11199"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/eastregion.mk\/en\/wp-json\/wp\/v2\/categories?post=11199"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/eastregion.mk\/en\/wp-json\/wp\/v2\/tags?post=11199"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}